In late Autumn 2020 works to Community Parking area were carried out. The car park was enlarged to increase capacity and a tarmac surface laid down. At the same time drainage works were carried out around the children’s play area, connecting in with drainage laid down for the car park. The excess spoil from the car park works was spread over the valley created by the bund from the surgery works, thus creating a flatter landscape and hopefully a more useable one. Grass seed was laid down over all disturbed areas and it will be Spring 2021 before the success of this part of the works can be evaluated. More work may have to be carried out during 2021.